ZELLAMID® 1400 T (PET) – Sheet
Slip-modified PET with superior coefficient of friction and abrasion resistance for demanding sliding applications
ZELLAMID® 1400 T is a slip-modified PET grade which offers a significantly lower coefficient of friction and increased abrasion resistance compared to unfilled PET-P. In terms of these properties, it even outperforms oil-filled or wax-filled cast polyamide as well as PTFE-fibre-filled POM-H grades.
ZELLAMID® = a registered trademark in the field of engineering plastics.
All detailsGlossary
| Item no. | Length (mm) | Width (mm) | Height (mm) | Colour | Price | SP | Delivery time | Quantity | |
|---|---|---|---|---|---|---|---|---|---|
| 945918 | 1000 | 1000 | 8 |
|
CHF 289.15
CHF 289.15 /Stk.
per
m²
|
3–4 days |
1m²
|
||
| 934631 | 1000 | 610 | 8 |
|
CHF 289.10
CHF 176.35 /Stk.
per
m²
|
3–4 days |
0.61m²
|
||
| 934636 | 1000 | 610 | 10 |
|
CHF 355.90
CHF 217.10 /Stk.
per
m²
|
3–4 days |
0.61m²
|
||
| 934639 | 1000 | 1000 | 12 |
|
CHF 431.25
CHF 431.25 /Stk.
per
m²
|
3–4 days |
1m²
|
||
| 934642 | 1000 | 610 | 12 |
|
CHF 431.10
CHF 262.95 /Stk.
per
m²
|
3–4 days |
0.61m²
|
||
| 934652 | 1000 | 1000 | 20 |
|
CHF 678.50
CHF 678.50 /Stk.
per
m²
|
3–4 days |
1m²
|
||
| 934655 | 1000 | 610 | 20 |
|
CHF 678.25
CHF 413.75 /Stk.
per
m²
|
3–4 days |
0.61m²
|
||
| 934660 | 1000 | 610 | 25 |
|
CHF 840.50
CHF 512.70 /Stk.
per
m²
|
3–4 days |
0.61m²
|
||
| 934665 | 1000 | 610 | 30 |
|
CHF 1,022.25
CHF 623.55 /Stk.
per
m²
|
3–4 days |
0.61m²
|
||
| 934668 | 1000 | 1000 | 35 |
|
CHF 1,077.20
CHF 1,077.20 /Stk.
per
m²
|
3–4 days |
1m²
|
||
| 937215 | 1000 | 610 | 35 |
|
CHF 1,184.50
CHF 722.55 /Stk.
per
m²
|
3–4 days |
0.61m²
|
||
| 934672 | 1000 | 1000 | 40 |
|
CHF 1,224.75
CHF 1,224.75 /Stk.
per
m²
|
3–4 days |
1m²
|
||
| 934675 | 1000 | 610 | 40 |
|
CHF 1,346.75
CHF 821.55 /Stk.
per
m²
|
3–4 days |
0.61m²
|
||
| 934678 | 1000 | 1000 | 50 |
|
CHF 1,519.90
CHF 1,519.90 /Stk.
per
m²
|
3–4 days |
1m²
|
||
| 934680 | 1000 | 610 | 50 |
|
CHF 1,671.25
CHF 1,019.45 /Stk.
per
m²
|
3–4 days |
0.61m²
|
||
| 934683 | 1000 | 610 | 60 |
|
CHF 1,829.10
CHF 1,115.75 /Stk.
per
m²
|
3–4 days |
0.61m²
|
||
| 934687 | 1000 | 610 | 70 |
|
CHF 2,250.55
CHF 1,372.85 /Stk.
per
m²
|
3–4 days |
0.61m²
|
||
| 934690 | 1000 | 610 | 80 |
|
CHF 2,586.60
CHF 1,577.80 /Stk.
per
m²
|
3–4 days |
0.61m²
|
||
| 934693 | 1000 | 610 | 90 |
|
CHF 2,899.20
CHF 1,768.50 /Stk.
per
m²
|
3–4 days |
0.61m²
|
||
| 934695 | 1000 | 610 | 100 |
|
CHF 3,211.75
CHF 1,959.15 /Stk.
per
m²
|
3–4 days |
0.61m²
|
||
| 934646 | 1000 | 1000 | 15 |
|
CHF 516.15
CHF 516.15 /Stk.
per
m²
|
3–4 days |
1m²
|
||
| 934649 | 1000 | 610 | 15 |
|
CHF 515.95
CHF 314.75 /Stk.
per
m²
|
3–4 days |
0.61m²
|
||
| 934630 | 2000 | 610 | 8 |
|
CHF 289.15
CHF 352.80 /Stk.
per
m²
|
1–2 days |
1.22m²
|
||
| 934632 | 2000 | 610 | 8 |
|
CHF 289.05
CHF 352.65 /Stk.
per
m²
|
3–4 days |
1.22m²
|
||
| 934634 | 2000 | 1000 | 10 |
|
CHF 356.00
CHF 712.05 /Stk.
per
m²
|
3–4 days |
2m²
|
||
| 934637 | 2000 | 610 | 10 |
|
CHF 355.90
CHF 434.20 /Stk.
per
m²
|
3–4 days |
1.22m²
|
||
| 934647 | 2000 | 610 | 15 |
|
CHF 516.15
CHF 629.75 /Stk.
per
m²
|
1–2 days |
1.22m²
|
||
| 934653 | 2000 | 610 | 20 |
|
CHF 616.80
CHF 752.50 /Stk.
per
m²
|
1–2 days |
1.22m²
|
||
| 934654 | 2000 | 1220 | 20 |
|
CHF 616.85
CHF 1,505.10 /Stk.
per
m²
|
3–4 days |
2.44m²
|
||
| 934656 | 2000 | 610 | 20 |
|
CHF 678.25
CHF 827.45 /Stk.
per
m²
|
3–4 days |
1.22m²
|
||
| 934658 | 2000 | 1000 | 25 |
|
CHF 764.40
CHF 1,528.75 /Stk.
per
m²
|
3–4 days |
2m²
|
||
| 934659 | 2000 | 1220 | 25 |
|
CHF 764.40
CHF 1,865.15 /Stk.
per
m²
|
3–4 days |
2.44m²
|
||
| 934661 | 2000 | 610 | 25 |
|
CHF 840.50
CHF 1,025.40 /Stk.
per
m²
|
3–4 days |
1.22m²
|
||
| 934663 | 2000 | 610 | 30 |
|
CHF 929.65
CHF 1,134.15 /Stk.
per
m²
|
1–2 days |
1.22m²
|
||
| 934664 | 2000 | 1220 | 30 |
|
CHF 836.70
CHF 2,041.55 /Stk.
per
m²
|
3–4 days |
2.44m²
|
||
| 934666 | 2000 | 610 | 30 |
|
CHF 929.30
CHF 1,133.75 /Stk.
per
m²
|
3–4 days |
1.22m²
|
||
| 934669 | 2000 | 1000 | 35 |
|
CHF 969.50
CHF 1,939.00 /Stk.
per
m²
|
3–4 days |
2m²
|
||
| 934670 | 2000 | 610 | 35 |
|
CHF 1,076.80
CHF 1,313.70 /Stk.
per
m²
|
3–4 days |
1.22m²
|
||
| 934673 | 2000 | 610 | 40 |
|
CHF 1,102.30
CHF 1,344.80 /Stk.
per
m²
|
1–2 days |
1.22m²
|
||
| 934674 | 2000 | 1220 | 40 |
|
CHF 1,102.35
CHF 2,689.70 /Stk.
per
m²
|
3–4 days |
2.44m²
|
||
| 934676 | 2000 | 610 | 40 |
|
CHF 1,224.30
CHF 1,493.65 /Stk.
per
m²
|
3–4 days |
1.22m²
|
||
| 934679 | 2000 | 1000 | 50 |
|
CHF 1,367.90
CHF 2,735.80 /Stk.
per
m²
|
3–4 days |
2m²
|
||
| 934681 | 2000 | 610 | 50 |
|
CHF 1,519.35
CHF 1,853.60 /Stk.
per
m²
|
3–4 days |
1.22m²
|
||
| 944890 | 2000 | 1000 | 60 |
|
CHF 1,646.80
CHF 3,293.60 /Stk.
per
m²
|
3–4 days |
2m²
|
||
| 934684 | 2000 | 610 | 60 |
|
CHF 1,646.20
CHF 2,008.35 /Stk.
per
m²
|
3–4 days |
1.22m²
|
||
| 944897 | 2000 | 1000 | 70 |
|
CHF 2,026.25
CHF 4,052.50 /Stk.
per
m²
|
3–4 days |
2m²
|
||
| 934688 | 2000 | 610 | 70 |
|
CHF 2,025.50
CHF 2,471.15 /Stk.
per
m²
|
3–4 days |
1.22m²
|
||
| 934691 | 2000 | 610 | 80 |
|
CHF 2,327.95
CHF 2,840.05 /Stk.
per
m²
|
3–4 days |
1.22m²
|
||
| 934694 | 2000 | 610 | 90 |
|
CHF 2,609.25
CHF 3,183.30 /Stk.
per
m²
|
3–4 days |
1.22m²
|
||
| 934696 | 2000 | 610 | 100 |
|
CHF 2,890.60
CHF 3,526.50 /Stk.
per
m²
|
3–4 days |
1.22m²
|
||
| 934640 | 2000 | 1000 | 12 |
|
CHF 431.25
CHF 862.50 /Stk.
per
m²
|
3–4 days |
2m²
|
||
| 934643 | 2000 | 610 | 12 |
|
CHF 431.10
CHF 525.95 /Stk.
per
m²
|
3–4 days |
1.22m²
|
||
| 934648 | 2000 | 1220 | 15 |
|
CHF 469.25
CHF 1,145.00 /Stk.
per
m²
|
3–4 days |
2.44m²
|
||
| 934650 | 2000 | 610 | 15 |
|
CHF 516.00
CHF 629.50 /Stk.
per
m²
|
3–4 days |
1.22m²
|
||
| 934633 | 3000 | 610 | 8 |
|
CHF 289.05
CHF 529.00 /Stk.
per
m²
|
3–4 days |
1.83m²
|
||
| 934635 | 3000 | 1000 | 10 |
|
CHF 356.05
CHF 1,068.10 /Stk.
per
m²
|
3–4 days |
3m²
|
||
| 934638 | 3000 | 610 | 10 |
|
CHF 355.90
CHF 651.30 /Stk.
per
m²
|
3–4 days |
1.83m²
|
||
| 934657 | 3000 | 610 | 20 |
|
CHF 616.60
CHF 1,128.35 /Stk.
per
m²
|
3–4 days |
1.83m²
|
||
| 934662 | 3000 | 610 | 25 |
|
CHF 764.10
CHF 1,398.30 /Stk.
per
m²
|
3–4 days |
1.83m²
|
||
| 934667 | 3000 | 610 | 30 |
|
CHF 929.30
CHF 1,700.65 /Stk.
per
m²
|
3–4 days |
1.83m²
|
||
| 934671 | 3000 | 610 | 35 |
|
CHF 1,076.80
CHF 1,970.60 /Stk.
per
m²
|
3–4 days |
1.83m²
|
||
| 934677 | 3000 | 610 | 40 |
|
CHF 1,101.90
CHF 2,016.50 /Stk.
per
m²
|
3–4 days |
1.83m²
|
||
| 934682 | 3000 | 610 | 50 |
|
CHF 1,367.40
CHF 2,502.35 /Stk.
per
m²
|
3–4 days |
1.83m²
|
||
| 934685 | 3000 | 610 | 60 |
|
CHF 1,646.20
CHF 3,012.55 /Stk.
per
m²
|
3–4 days |
1.83m²
|
||
| 934689 | 3000 | 610 | 70 |
|
CHF 2,025.50
CHF 3,706.70 /Stk.
per
m²
|
3–4 days |
1.83m²
|
||
| 934692 | 3000 | 610 | 80 |
|
CHF 2,327.95
CHF 4,260.10 /Stk.
per
m²
|
3–4 days |
1.83m²
|
||
| 934697 | 3000 | 610 | 100 |
|
CHF 2,890.60
CHF 5,289.75 /Stk.
per
m²
|
3–4 days |
1.83m²
|
||
| 934641 | 3000 | 1000 | 12 |
|
CHF 392.05
CHF 1,176.10 /Stk.
per
m²
|
3–4 days |
3m²
|
||
| 934644 | 3000 | 610 | 12 |
|
CHF 431.10
CHF 788.90 /Stk.
per
m²
|
3–4 days |
1.83m²
|
||
| 934651 | 3000 | 610 | 15 |
|
CHF 516.00
CHF 944.25 /Stk.
per
m²
|
3–4 days |
1.83m²
|
Order the cut-to-size piece according to your specifications.
ZELLAMID® 1400 T is a slip-modified PET grade which, compared to unfilled PET-P, offers a significantly lower coefficient of friction and increased abrasion resistance. In terms of these properties, it even outperforms oil-filled or wax-filled cast polyamide, as well as PTFE-fibre-filled POM-H grades.
The material combines the proven fundamental properties of PET – excellent dimensional stability, high strength and low moisture absorption – with improved sliding properties thanks to the lubricity modification. This enables its use in demanding tribological applications without the need for additional lubrication.
ZELLAMID® 1400 T is suitable for sliding components subject to high surface pressure and high speeds, as well as for applications where minimal wear and low frictional heat are crucial.
Typical applications include rollers, gears, valves, distributor valves, precision bearings and connectors in mechanical engineering, automotive engineering and the electrical industry.